In this paper, the Generation and Transmission Expansion Planning (G&TEP) problem is presented considering environmental pollution with the presence of wind units and FACTS devices.The objective function of this problem is equal to maximizing the profit of the investors in the generation and transmission sector, and the constraints of the problem include the AC power flow equations, wind units, FACTS devices, system operation constraints, and environmental pollution.The basic problem model is a nonlinear mixed integer problem, which will lead to complex problems in solving the problem.Therefore, this paper will present a mixed integer linear problem (MILP) model equivalent to the basic problem using conventional linearization methods.Finally, the proposed problem is applied to the test network using GAMS software, and then the capability of the problem is evaluated.
Akbari E. Integrated generation and transmission line expansion planning considering reactive power in the presence of uncertainty of wind farms and FACTS devices. تحقیقات نوین در سیستمهای قدرت هوشمند 2025; 13 (4) :23-36 URL: http://jeps.dezful.iau.ir/article-1-527-en.html