[Home ] [Archive]   [ فارسی ]  
:: Main :: About :: Current Issue :: Archive :: Search :: Submit :: Contact ::
Main Menu
Home::
Journal Information::
Articles archive::
For Authors::
For Reviewers::
Registration::
Contact us::
Site Facilities::
::
Search in website

Advanced Search
..
Receive site information
Enter your Email in the following box to receive the site news and information.
..
Overall Journal Statistics
Published articles: 239
Acceptance rate: 84.2
Rejection rate: 15.8
Average time to review: 97 days
Average time to publish: 26 days
..
:: Volume 13, Issue 4 (2-2025) ::
تحقیقات نوین در سیستمهای قدرت هوشمند 2025, 13(4): 23-36 Back to browse issues page
Integrated generation and transmission line expansion planning considering reactive power in the presence of uncertainty of wind farms and FACTS devices
Ehsan Akbari *
Department of Electrical Engineering, Mazandaran University of Science and Technology, Babol, Iran
Abstract:   (201 Views)
In this paper, the Generation and Transmission Expansion Planning (G&TEP) problem is presented considering environmental pollution with the presence of wind units and FACTS devices. The objective function of this problem is equal to maximizing the profit of the investors in the generation and transmission sector, and the constraints of the problem include the AC power flow equations, wind units, FACTS devices, system operation constraints, and environmental pollution. The basic problem model is a nonlinear mixed integer problem, which will lead to complex problems in solving the problem. Therefore, this paper will present a mixed integer linear problem (MILP) model equivalent to the basic problem using conventional linearization methods. Finally, the proposed problem is applied to the test network using GAMS software, and then the capability of the problem is evaluated.
Keywords: Generation and Transmission Expansion Planning, linear AC power flow, wind unit, FACTS devices.
Full-Text [PDF 598 kb]   (49 Downloads)    
Type of Study: Research | Subject: Special
Received: 2024/12/7 | Accepted: 2025/02/4 | Published: 2025/02/28
Send email to the article author

Add your comments about this article
Your username or Email:

CAPTCHA


XML   Persian Abstract   Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Akbari E. Integrated generation and transmission line expansion planning considering reactive power in the presence of uncertainty of wind farms and FACTS devices. تحقیقات نوین در سیستمهای قدرت هوشمند 2025; 13 (4) :23-36
URL: http://jeps.dezful.iau.ir/article-1-527-en.html


Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Volume 13, Issue 4 (2-2025) Back to browse issues page
تحقیقات نوین در برق Journal of Novel Researches on Electrical Power
Persian site map - English site map - Created in 0.07 seconds with 39 queries by YEKTAWEB 4710