[Home ] [Archive]   [ فارسی ]  
:: Main :: About :: Current Issue :: Archive :: Search :: Submit :: Contact ::
Main Menu
Home::
Journal Information::
Articles archive::
For Authors::
For Reviewers::
Registration::
Contact us::
Site Facilities::
::
Search in website

Advanced Search
..
Receive site information
Enter your Email in the following box to receive the site news and information.
..
Overall Journal Statistics
Published articles: 234
Acceptance rate: 84.3
Rejection rate: 15.7
Average time to review: 98 days
Average time to publish: 26 days
..
:: Volume 11, Issue 2 (9-2022) ::
تحقیقات نوین در سیستمهای قدرت هوشمند 2022, 11(2): 17-31 Back to browse issues page
Simultaneous Placement of capacitive banks and distributed generation power plants in order to improve reliability and minimize power losses using genetic algorithm
Behrouz Moarref * , Seyyed Mostafa Abedi , Mahmoud Reza Haghifam
Faculty of Electrical Engineering, South Tehran Branch, Islamic Azad University, Tehran, Iran
Abstract:   (135 Views)
Creating positive characteristics of power generation such as reducing power losses, improving voltage profiles and increasing reliability can be achieved through careful studies and significant costs. Therefore, the study of the mentioned cases and the presentation of optimal solutions has created a new field for research and study in the electricity industry. It should also be noted that most network designers recommend the use of distributed generation resources and capacitive banks in order to solve most of the distribution network problems. Therefore, in this paper, capacitive banks and distributed generation power plants are located simultaneously in the distribution network. The purpose of this placement is to minimize power losses, improve voltage profiles and improve reliability in parallel. The study will be conducted on the IEEE 118-bus network and will be done by designing scenarios based on fault and the number of resources placed. Also, genetic algorithm and forward-backward load flow method have been used as a problem solving technique using MATLAB software. ENS and SAIDI indicators are evaluated to improve the reliability of the island network and then its effect on the studied network is investigated.
Keywords: Simultaneous placement, Improve Reliability, Genetic algorithm, reduction of losses, Improved voltage profile
Full-Text [PDF 1420 kb]   (82 Downloads)    
Type of Study: Research | Subject: Special
Received: 2022/04/9 | Accepted: 2022/07/6 | Published: 2022/09/21
Send email to the article author

Add your comments about this article
Your username or Email:

CAPTCHA


XML   Persian Abstract   Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Moarref B, Abedi S M, Haghifam M R. Simultaneous Placement of capacitive banks and distributed generation power plants in order to improve reliability and minimize power losses using genetic algorithm. تحقیقات نوین در سیستمهای قدرت هوشمند 2022; 11 (2) :17-31
URL: http://jeps.dezful.iau.ir/article-1-417-en.html


Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Volume 11, Issue 2 (9-2022) Back to browse issues page
تحقیقات نوین در برق Journal of Novel Researches on Electrical Power
Persian site map - English site map - Created in 0.06 seconds with 37 queries by YEKTAWEB 4700